Project Overview

  • Client: Brilliant Stages
  • Location: American Express Community Stadium, Brighton & Hove Albion Football Club, Falmer, Brighton, BN1 9BL
  • Project Type: Full independent access scaffolds
  • Timescale: 4 weeks
  • Site manager: Jess Woodward

Scaffolding Requirements

Full access scaffold platforms X2, to replace screen fronts on the large televisions within the stadium. Scaffolding was tied using raker ties as well and tying into the steel beams, which is part of the stadium strucutre to ensure the scaffolding was structurally safe. The Brilliant Stages team had to remove the old screen panels and replace them with new ones. To do so we had to leave a 300mm gap internally to allow the screen replacement to take place. Therefor the operatives working on the scaffold had to be in harnesses throughout works.

How we approached this project

1.Planning and Safety Considerations: Planning and executing this scaffolding project inside a football stadium required plenty of coordination and attention to detail due to the unique challenges of the environment.

The first step was a thorough site assessment to understand the stadium’s layout, potential access restrictions, and structural considerations. This was followed by a detailed project plan that outlines materials, load capacities, and compliance with safety standards.

The erection and dismantle was out of the Premier League season so there were no football games scheduled, as well as events on site to avoid disruption.

Erecting the scaffolding required careful staging to ensure that work progresses efficiently without affecting stadium infrastructure.

Since the football stadium often have limited downtime, efficient scheduling is key, and the project had to be complete within a tight 4-week deadline to ensure the stadium remains operational. Regular communication with stadium management ensured the project aligns with broader stadium operations.

  • Design and planning
  • Logistic planning
  • Supervision during erection & dismantle

Our team, the Amex team and the Brilliant Stages team planned successfully to erect & dismantle the scaffolding within a 4-week window. With successful planning and hitting deadlines in place.

2.  Engineering and Scaffold Design: Scaffold design was a simple task. The engineer only had few risk factors.

Key design elements include:

  • Building survey – The engineer was given building structural calculations to ensure the scaffold was safe to erect within the stadium on the foundations.
  • Structure safety – Rakers ties and reveal ties were used to keep the scaffold structurally safe. There was plenty of stadium beam work to attach to.
  • Platform size – The design engineer had to ensure that the independent scaffold width, height & length was suitable for all operatives to work on and always ensure a high level of safety. There was a gap of 300mm between the scaffolding and the screen to allow works to be carried out. Therefore the operatives removing and replacing the screens had to wear a harness full-time to prevent a fall from height.
Ace Scaffolding Sports Centres Amex Community Stadium 4

3. Installation of scaffold on site (The installation process was as follows):

  • Installing working area barriers and signage
  • Walking equipment into the site from the designated loading bay area outside the stadium
  • Erection of the full independent scaffold
  • Adding ties required by design
  • Installation of brick guards

Once the work was complete, all scaffold is dismantled in reverse order.

Our in-house team provided the following on completion:

  • Hand over certificate
  • Weekly scaffold inspections
  • Scaffolding inspection register report

Erecting scaffolding in the Amex football stadium demanded the highest levels of health and safety preparation to protect both workers, on site staff and the public.

ACE Scaffolding is privileged to undertake such an important project, recognizing the trust placed in us to deliver our services that supports the smooth operation of the stadium. Being part of the construction process in such a high-profile venue reflects the confidence in our expertise and commitment to safety excellence.

Jess Woodward and her team were highly organised and professional throughout the works.

Ace Scaffolding Sports Centres Amex Community Stadium

“Breyer Group PLC have been working alongside ACE Scaffolding for the past 2 years. We value our collaboration, their quality of workmanship and professionalism,highly recommended”

Stephen JexSenior Contracts Manager, Breyer Group PLC

“As always, Ace did an ace job for me. Very responsive to all enquiries, good survey with several options for the job and kept me updated on the schedule. All work was done efficiently and tidily.”

John RouseBuilder

“The full package! Great team on site yesterday and a pleasure to work with. I have been very impressed with ACE Scaffolding so far. Keep it up.”

Russell ForderSite Manager, Square One Construction

“Very quick and efficient scaffolding for our works on our house in Brighton. I have recommended them many times to friends and family who have also been very happy with the service.”

Ian WalkerHome Owner

“They listened to how I thought the scaffolding should be built then suggested a far better way of doing it, making my job far safer and easier to perform.”

Ashley BurrowsBuilder

“Very quick and efficient scaffolding for our works on our house in Brighton. I have recommended them many times to friends and family who have also been very happy with the service.”

Ian WalkerHome Owner

“All of the staff, through to the lads on site are very organised and know what they are doing. The price for the job was super competitive and they will be my number one go to in the future.”

Ken MitchellBuilder

“Recently used these guys for a job at my place of work, they were really polite and couldn’t have been better to have around. Super helpful as well and even helped me clean the gutter.”

Alfie AlvarezCommercial Customer

“We have used Ace Scaffolding for the last five years for all our scaffolding works and found them to be reliable and give a good service.”

Howard Building & Maintenance Ltd.Builder

“Ace Scaffolding have once again blown me away with their service, The skill of their tradesmen, the politeness and helpfulness of their tradesmen, and their reliability.”

Ashley BurrowsBuilder
View More Testimonials

Ready to discuss your scaffolding requirements?